ELECTRICAL ADVICE
EICR landlord checklist: preparing for your inspection
Use this EICR landlord checklist to prepare for an electrical inspection of a rented flat or house in Putney. An Electrical Installation Condition Report records the condition of the fixed installation. Having the right documents and access ready helps the visit run smoothly and makes the next steps clearer.
What does an EICR cover?
A competent inspector assesses the installation, including its wiring, consumer unit, sockets and other fixed electrical equipment. The report records defects, deterioration and safety concerns, together with the extent of the inspection and any limitations. It is a condition report, rather than a promise that nothing can go wrong. Electrical Safety First explains periodic inspection and testing.
An EICR is different from checking individual portable appliances. When requesting a quotation, explain whether you need the fixed installation inspected, appliance checks, or both.
When should a landlord arrange the inspection?
For tenancies covered by England's electrical safety regulations, the installation must be inspected by a qualified person at least every five years, or sooner if the previous report specifies a shorter interval. Give existing tenants their report within 28 days and new tenants a copy before they move in. A change of tenant does not automatically require a fresh inspection where a suitable current report remains valid, but damage or safety concerns need attention.
The rules cover private and social renting, with exceptions and additional requirements for social landlords. Check the current GOV.UK landlord guidance for your circumstances.
EICR landlord checklist: before the visit
- Find the previous EICR and certificates for alterations or repairs, and share them with the inspector.
- Confirm access with the tenant or managing agent, including keys, entry systems and any locked meter cupboards.
- Clear a safe route to the consumer unit, sockets and fixed equipment. Do not remove electrical covers yourself.
- Tell the electrician about tripping, damaged fittings, burning smells, leaks or recent electrical work.
- Ask how long the inspection may take and when power will be off. The time depends on the installation and access; mention medical equipment and other essential supplies before booking.
- Agree what the quotation includes: inspection, written report, access limitations and any separate remedial work. Ask when you should expect the report.
For a Putney flat, confirm access to shared meter cupboards with the managing agent. Establish which installation the booking covers: access to a shared cupboard does not mean communal lighting or the rest of the building is included.
Understanding the findings
C1 means danger is present; C2 means a potentially dangerous condition. Either makes the report unsatisfactory. C3 recommends an improvement and does not itself make the report unsatisfactory. FI flags further investigation. Under Amendment 4, FI alone is advisory rather than an automatic unsatisfactory result: see the IET explanation of FI reporting. Ask the inspector which actions your report requires; this distinction does not remove a landlord’s duties where investigative work is required.
Complete required remedial or investigative work within 28 days, or sooner if the report specifies. Within 28 days of completion, give the tenant and local council the report and written confirmation from the qualified person. An immediate danger needs immediate attention; do not wait for the deadline.
Does an older installation automatically need rewiring?
No. Decisions should follow inspection and testing, rather than the property's age alone. Electrical Safety First's home-buyer guidance explains why an older consumer unit does not necessarily mean an installation is unsafe or needs upgrading.
Arrange an EICR in Putney
See our electrical inspection and maintenance service, or call 0787 164 7667. Have the property postcode, type of property, previous report and any tenancy deadline ready so we can discuss the right inspection and quotation.
Guidance checked: 12 November 2026. This page covers England; requirements elsewhere in the UK differ.